Cable laying, utility works and groundworks
A fibre connection for a business park, new power cables to a warehouse or a duct under the driveway: we pass your request on to groundworks contractors in Germany, who inspect the route, quote in writing and lay everything properly.
- Free request
- Written quote
- Vetted partner companies
What is included
Cable laying
Laying of power, telecommunications and control cables by open trenching, with sand bedding and warning tape.
Fibre and ducting
Fibre broadband connections and duct routes for residential complexes, business parks and individual buildings, from trench to building entry.
Horizontal directional drilling
Trenchless crossing of roads, railway lines, driveways and plots by directional drilling, without breaking up the surface.
Pipe laying
Pipes for water, foul water and rainwater, with service connections made by companies approved by the network operator.
Roads and paths
Paving and asphalt work, access roads and paths for private plots, commercial sites and local authority clients.
Surface reinstatement
Backfilling, compacting and reinstating lawn, paving or asphalt after the excavation.
How to recognise a good provider
- Inspection of the route before a quote is prepared
- Utility records obtained before any digging starts
- Reasoned choice between open trenching and drilling
- Written quote stating length, depth and surface
- Clear agreement on who applies for the permits
The legal position
Before any excavation, the utility operators must be asked for information on existing cables and pipes. Work in public roads requires the consent of the road authority and, where traffic is affected, a traffic order from the road traffic authority. Water or gas service connections may only be made by companies approved by the network operator. The partner companies know these procedures; please check with the authority in advance whether a permit is needed in your case.
How it works
Request
You describe the route, the type of cable and the timeframe.
Inspection
The groundworks contractor looks at the route.
Quote
In writing, with method, scope and date.
Work
Laying, backfilling and reinstatement of the surface.
Who is behind this service
E1 Global Partners Network is the partner network of the E1 group from Wiesbaden, active in real estate since 2007. We take your request, select a vetted partner and remain your point of contact. Quote, contract and invoice come directly from the partner carrying out the work. On request we also arrange further partners for traffic management or removal of the spoil. Within a few days we let you know whether a partner is available in your region.
Do you live abroad?
Many owners and investors with land and commercial property in Germany live abroad. We coordinate everything by email, phone or video call, arrange access for the contractor and send you photos and documents.
Are you a groundworks contractor?
Become a franchise partner in the E1 network and receive requests from your region.
Become a partnerFrequently asked questions
How much does cable laying cost?
That depends on the length of the route, the ground, the surface, the laying depth and existing services. The groundworks contractor looks at the route and gives you the price in a written quote before any work begins.
Trench or drilling, which makes more sense?
That depends on the ground, the length of the route, existing services and the surface. Under roads, driveways or railway lines, drilling is often the obvious choice. The partner company checks this during the inspection and explains its recommendation.
Who takes care of utility records and permits?
The partner companies know the procedures and obtain the utility records. Applications to the road authority or the road traffic authority are made according to what is agreed. Who handles what is set out in the quote.
Does E1 carry out the work itself?
No. E1 Global Partners Network GmbH passes your request on to an independent groundworks contractor. Quote, contract, work and invoice are handled directly between you and the partner, and we remain your point of contact.
Which documents help with the request?
The location and approximate length of the route, ideally with a site plan, the type of cable or pipe, any required laying depth, the surface and any existing utility records or plans. Photos of the route also help.
Send a request
Briefly describe what you need. We will get back to you with the right partner and the next steps.
More services in the network
Requests via E1 Global Partners Network GmbH, Sportplatzweg 4, 65201 Wiesbaden, Germany (HRB 34837, Wiesbaden Local Court). The quote, contract and invoice are issued by the partner business carrying out the work. Legal information to the best of our knowledge, without guarantee; in individual cases your adviser decides. As of October 2026.